Build a starter gold plant
What can you build with $10,000, $30,000 or $50,000, and which machines do you really need? Start from a ready-made alluvial or hard-rock plant, then add, move and connect machines on a top view of the site. The builder keeps a running average cost, checks the power and feed sizes, and tells you what is missing.
A hopper, two sluices, a water pump and a settling pond. It leaves room in the budget for a centrifuge later.
Equipment list
| Item | Qty | Need | Price each (USD) |
|---|---|---|---|
| Feed hopper with grizzly | 1 | Recommended | $600-$1,500 local, estimate |
| Riffle and carpet sluice | 2 | Essential | $300-$900 local, estimate |
| Gold room kit | 1 | Essential | $500-$1,500 local, estimate |
| Water pump 3", petrol | 1 | Essential | $150-$600 local, estimate |
| Settling pond with liner | 1 | Recommended | $400-$1,000 local, estimate |
FOB China means the price of the machine loaded on a ship at a Chinese port; shipping, clearance and delivery are added in the estimate above. Imported prices are from supplier listings checked in October 2026. Not included: mining licence and permits; digging and hauling the ore or gravel; land, camp and security; import duty and VAT where they apply; wages and working capital for the first months.
Gold plant costs and how plants are set up
How much does a small gold processing plant cost?
For new gravity equipment delivered and built in Tanzania, the starting plants in the builder average about $5,600 for a basic alluvial sluice plant, $30,800 for an alluvial plant with a trommel and centrifuge, $14,000 for the leanest hard-rock plant and $52,400 for a hard-rock plant with three wet pan mills. These are planning averages that include 25% for shipping and delivery of imported machines, 15% for foundation, piping and wiring materials, and the engineer and builders at Tanzania rates. They exclude the mining licence and permits, digging and hauling the ore or gravel, land, camp and security, import duty and VAT where they apply, wages and working capital for the first months, so the money needed to reach first gold is higher.
How much is an alluvial gold wash plant?
A small alluvial plant can start with a feed hopper, two sluices, a petrol water pump and a settling pond, which averages about $5,600 in the builder. Adding a mini trommel, a centrifuge and a shaking table raises the average to about $30,800 and lets the plant catch more of the fine gold. A 20-30 t/h trommel feeding three sluices averages about $46,800. Which one fits depends on how much gravel you can mine each day, how fine the gold is and how much clay the gravel holds.
How much does a trommel or scrubber cost?
Supplier listings checked in October 2026 put a 10-15 t/h mini trommel at $2,600 to $5,900 and a 20-30 t/h trommel at $4,000 to $15,000, FOB China. A 1.5 × 4 m rotary scrubber, which is only needed for sticky clay gravel, is a Bart Mining planning estimate of $10,000 to $20,000. Shipping, clearance and installation come on top, and a trommel also needs a generator and a steady water supply.
How do you set up a small hard-rock gold plant?
The ore moves from the stockpile through a feed hopper to a jaw crusher, which breaks it to about 20 mm. A hammer mill can crush it finer before wet pan mills or a ball mill grind it with water. The slurry then flows over carpet sluices and through a centrifugal concentrator, and the concentrate is cleaned on a shaking table before it is finished in a secure gold room. A generator powers the electric machines, a pump supplies water, and a settling pond lets the water be reused. The builder shows this layout for each starting plant.
What equipment does a small gold plant need?
Every plant needs a way to feed the material, a way to free the gold, a way to catch it, a secure place to finish it, water and, for electric machines, power. On alluvial ground washing frees the gold, so a hopper, sluices, a pump and a gold room are the minimum. Hard rock also needs a crusher and at least one mill. A centrifuge, a shaking table and a settling pond are recommended because they recover fine gold and save water. The builder marks each machine as essential, recommended or optional.
How much is a wet pan mill and how many do I need?
A wet pan mill 1100 lists at $2,000 to $4,100 FOB China and grinds about 0.6 t/h, while a 1500 lists at $3,400 to $8,000 and grinds about 1.25 t/h. The mills usually set the pace of a small hard-rock plant, so divide the tonnes you want to treat each hour by the capacity of one mill. Three 1100 mills, for example, treat about 1.8 t/h of crushed ore.
How much does a jaw crusher cost for small-scale gold mining?
A PE-150×250 jaw crusher, which takes rock up to about 125 mm and handles about 3 t/h, lists at $700 to $1,900 FOB China with an electric motor and $1,500 to $2,500 with its own diesel engine. A PE-250×400 takes larger rock at about 8 t/h and lists at $2,800 to $4,200. Choose the size from the largest rock you mine and the feed rate of your mills.
How much is a centrifugal gold concentrator?
An STLB-20 centrifuge, suited to plants up to about 2 t/h, lists at $2,800 to $3,900 FOB China. An STLB-60 for larger plants lists at $4,500 to $12,000. A centrifuge catches fine free gold that sluices let through without using mercury, but it needs a screened feed below about 6 mm and a steady water supply.
What size generator does a gold plant need?
Add the motor ratings of every electric machine and divide by about 0.8 to get the minimum generator rating in kVA, then size up because motors draw extra power when they start. The hard-rock plant with three wet pan mills has about 42 kW of motors, which needs at least 52 kVA, so the builder pairs it with a 100 kVA generator. Machines with their own diesel engines need no generator but use fuel on their own.
How much fuel does a small gold plant use?
The builder estimates about 0.27 litres of diesel for each kWh of generator load, plus the engines on diesel and petrol machines. On that basis the hard-rock plant with three wet pan mills uses about 12 litres an hour, or about 2540 litres a month at 8 hours a day and 26 days a month. Multiply by your local diesel price to add fuel to the operating budget.
How much does a CIP plant cost and how is it built?
The builder covers gravity plants only. A carbon-in-pulp (CIP) or carbon-in-leach (CIL) plant adds leach tanks with agitators, activated carbon, cyanide handling, an elution and smelting circuit, a laboratory and permits for cyanide use, so it costs far more than a gravity plant of the same size. Its design depends on leach tests on your ore, which show how much gold cyanide recovers and how long the ore must stay in the tanks. Many small operations start with gravity and add leaching for the tailings once the plant is producing.
Should I choose a gravity plant or a CIP plant?
Gravity suits free gold that is coarse enough to settle in a sluice, centrifuge or table, and it is cheaper to build and run. Leaching suits fine gold or gold that gravity cannot catch, but it needs more capital, chemicals, skills and permits. A gravity recovery test and a leach test on a representative sample show how much gold each route recovers, which is the basis for choosing between them.
How long does it take to build a gold plant?
A powered plant with a generator, crushers or a trommel usually takes 2 to 3 months to build, depending on its size and on whether all the machines and materials are on site before work starts. Buying items one by one while the plant is going up is the most common cause of delay. A small plant with no electric machines, such as a hopper, sluices and a pump, usually goes up in about 1 week.
How much does it cost to pay an engineer and builders to set up a plant?
At Tanzania rates, an engineer who designs the layout and supervises a 2 to 3 month build earns about $5,000 for the job, and a crew of 4 builders at TZS 20,000 to 40,000 a day each costs about $1,500 to $4,400 over the build. A small plant that goes up in a week needs about $500 of engineering time and $76 to $213 for 2 builders. For comparison, an engineer in the USA would take home about $10,000 to $20,000 for the same 2 to 3 month job, before flights and accommodation. These are planning figures; the real cost depends on the site, the travel and how ready the materials are.
How to plan and set up a gold plant
How do I start a gold processing plant in Tanzania?
Start with the deposit: sample it and run a recovery test so you know whether gravity alone will catch the gold. Then work out how many tonnes you can mine a day, choose the plant size and machines, and make sure the licence and permits for the site cover processing. Price the equipment, delivery, site materials and labour, and keep money aside for fuel, wages and spares until the first gold is sold. Order everything before the build starts, then install, test with water and commission with ore.
How do I choose the right size of plant?
Divide the tonnes you can mine and deliver each day by the hours the plant will run. A mine that supplies 14 tonnes a day to a plant running 8 hours needs about 1.8 t/h, which is three wet pan mill 1100s at about 0.6 t/h each. Size the crusher, sluices and centrifuge to keep up with the mills, and the generator to run all the motors with headroom. A plant much larger than the mine can feed costs more and sits idle.
How do I set up an alluvial wash plant?
Choose level ground near water, with room for a stockpile, the plant and a settling pond below it. The gravel is tipped into a hopper with a grizzly, washed and sized in a trommel or scrubber, and the fine material runs over sluices and through a centrifuge. A pump brings water from the pond or river, and the tailings run back to the pond so the water can be reused. Set the plant out so slurry flows downhill by gravity wherever possible, which saves a slurry pump.
How do I set up a sluice to catch fine gold?
Feed the sluice with screened material, ideally under 6 mm from a trommel, at a steady rate and with enough water to keep the gravel moving without washing out the riffles. Line it with carpet or matting under the riffles, set it on a firm, even base and adjust the slope until the gravel travels and the heavy material stays behind. Clean up the carpets on a fixed schedule and send the concentrate to a shaking table or the gold room. A centrifuge after the sluice catches the fine gold the riffles let through.
How do I plan the budget for a gold plant?
Separate the budget into equipment, shipping and delivery, site materials, labour, permits and working capital. The builder covers the first four for the processing plant: for example, the hard-rock plant with three wet pan mills averages about $52,400. Add the cost of mining and hauling the ore, the licence and permits, and enough money for fuel, wages and spares for the first months, because a plant rarely produces at full rate from the first week.
How do I get a plant built faster?
Have the design, the full equipment list and the site ready before the engineer and builders arrive. Order every machine and the cement, steel, pipes and cable together rather than one by one, and prepare the foundations while the machines are in transit. Confirm the generator size and the water source early, because a late change to either holds up the wiring and piping.
How do I test my ore before buying a plant?
Take a representative sample from across the deposit, not only the richest spots, and have it assayed for gold. A gravity recovery test shows how much of that gold a sluice, centrifuge or table can catch, and a leach test shows whether cyanide would recover more. On alluvial ground, test pits show the grade, the depth of the gravel and how much clay it holds. The results decide the machines, the plant size and whether gravity alone pays.
How the plant builder works
How do I use the builder?
Pick the starting plant closest to your deposit and budget. Machines sit in process order from left to right, with power along the top and water along the bottom. Drag a machine up or down its column to reorder it. To connect two machines, drag from the round handle on the right of the first one onto the second, or select it and use its Connect to buttons. Select a machine or a line and press Remove to take it out.
When you add a machine while another is selected, the new one is connected to it automatically. Duplicate copies a machine with its connections, which is how you run two mills or two sluices side by side. The dot on each machine shows whether it is essential, recommended or optional.
On a phone, process stages run from top to bottom and the equipment list becomes a set of cards. You can switch between the starting plants and tap a machine for its details, costs and checks, but adding, moving and connecting machines needs a computer, where the drag controls and the equipment list have room to work.
What can I build with $10,000?
On alluvial ground, $10,000 covers a working starter plant: a hopper, two sluices, a water pump and a settling pond, with money left for a centrifuge later. Hard rock costs more because the ore must be crushed and ground before any gold is caught. The leanest new hard-rock plant in the builder, a diesel jaw crusher, one wet pan mill and a sluice, averages about $14,000 with shipping, installation and labour. Under $10,000, hard-rock miners usually start with used machines or pay to have their ore crushed.
Where do the prices come from?
Prices are ranges in US dollars for one new unit. Imported machines show FOB China prices, the price of the machine loaded on a ship at a Chinese port, from manufacturer listings on Made-in-China, Alibaba and Global Sources checked in October 2026. Outliers and bulk-order discounts are left out.
Hoppers, sluices, ponds, tanks, the gold room kit, small petrol pumps and small generators are local Tanzania prices. A few items had no reliable public listing, and the builder marks their ranges as Bart Mining estimates.
How is the total worked out?
The builder adds 25% of the FOB price of imported machines for sea freight, clearance and road delivery to site, and 15% of all equipment for foundation, piping and wiring materials. Labour is added separately: an engineer and a crew of builders at Tanzania rates, for about a week on a plant with no electric machines and 2 to 3 months on a powered plant. The average estimate is the midpoint of the resulting range. These are planning figures, not a quotation: a supplier's current price, the delivery route and your site can move the real figure either way.
How are throughput, power and fuel calculated?
Throughput is set by the weakest stage. A plant with a 3 t/h crusher and one wet pan mill grinding 0.6 t/h treats 0.6 t/h, so a second mill raises output more cheaply than a bigger crusher would. Power compares the electric load with about 80% of the generator's kVA rating. Fuel uses about 0.27 litres of diesel per kWh of load, plus the engines on diesel and petrol machines.
What does the estimate leave out?
The total covers the processing plant only. It does not include the mining licence and permits, digging and hauling the ore or gravel, land and security, import duty or VAT where they apply, or the wages and working capital needed until the first gold is sold.
How do I know which plant suits my deposit?
Gravity machines catch free gold well, but very fine gold or gold locked in sulphides needs a test before you commit to a plant. On a new hard-rock deposit, run a bulk sample through a small plant or a gravity test at a laboratory before fixing the number of mills. On alluvial ground, test pits show the grade and how much clay the gravel holds, which decides between a trommel and a scrubber. Our alluvial plant and wet pan mill plant examples show how these choices play out.
What happens when I ask for a quote?
Get a quote for this build puts your equipment list and the estimate into the contact form, so our team can confirm current prices, delivery to your site and the machine sizes for your ore. Copy share link saves the exact layout to a link you can send to a partner or open on another device.
Next step
Size the plant with our team
Send your build, the deposit type and any test results. We will confirm the equipment, current prices and the delivery schedule to your site.