Pneumatic Rock Drill: Jackleg Specs, Air and Steel

A pneumatic rock drill, commonly a jackleg or stoper, is the handheld or pusher-leg drill that still puts most small Tanzanian underground holes in the face. It runs on compressed air, turns a drill steel with a carbide bit, and advances by the pusher leg. A typical machine needs 100–150 cfm at 6–7 bar, drills 32–45 mm holes, and with a competent miner will put in a round of 1.5–2.4 m holes. The compressor, not the drill, is usually the constraint.

Exploration & Drilling·7 min read·Updated 2026-09-14
Pneumatic jackleg rock drill with pusher leg and air hose

Pneumatic Rock Drill (Jackleg) Specifications

The figures below describe typical industry specifications for this class of equipment rather than a single fixed model. Use them to scope a requirement, then confirm exact figures against the supplied unit before purchase.

Typical specification range for the Pneumatic Rock Drill (Jackleg)
SpecificationTypical value
Hole diameter32–45 mm typical
Hole depth per steel0.8–3.2 m in 0.8 m increments
Air consumption100–150 cfm (2.8–4.2 m³/min) at 6–7 bar
SteelHex 22 mm or 25 mm, integral or tapered
BitCarbide chisel or button, 34–41 mm
Mass25–45 kg plus pusher leg
LubricationInline air-line oiler, mandatory
WaterFront-head water flushing to suppress dust
Noise110–120 dB(A) at the operator; hearing protection mandatory

What a Pneumatic Rock Drill (Jackleg) Is Used For

  • Development blasting rounds in small shafts and drives
  • Production drilling on narrow veins
  • Secondary blasting of oversize
  • Anchor and utility holes underground

Maintenance Schedule

Most premature failures in this equipment class trace back to a missed routine check rather than a design fault. The intervals below are a practical starting schedule; adjust them to your duty cycle and the manufacturer manual.

Recommended maintenance intervals
IntervalTask
Every shiftFill the air-line oiler; inspect hoses, water tube and steel threads; check the leg for smooth travel.
DailyFlush the drill with oil at knock-off; inspect chuck bush and rotation pawls.
WeeklyStrip front head if rotation is sticky; inspect rifle bar and piston.
On failure to rotate or hammerUsually dry running (no oiler) or worn chuck. Do not keep running a dry drill — it seizes.

Frequently Asked Questions

How much compressor do four jacklegs need?

100–150 cfm each, plus leakage and diversity. Four drills working together need about 500–600 cfm at 6–7 bar at the face, not 400. Undersized air is the usual reason penetration drops and steels stick. See the mining air compressor page for the other half of this specification.

Jackleg, stoper or sinker?

Jackleg (pusher-leg) for drifting and inclined holes. Stoper (uphole) for raising and roof holes. Sinker for downward holes in shafts. They are different machines; a jackleg used as a stoper wrecks the miner and the hole. Specify the duty.

Why is water flushing mandatory?

Because dry drilling in silica ore produces respirable crystalline silica, which causes silicosis. Water through the steel knocks the dust down at the hole. Dry drilling is still seen on Tanzanian small mines and is one of the most damaging shortcuts in the industry.

Supply and Delivery Across Tanzania

Bart Mining supplies pneumatic rock drill (jackleg) and related equipment to mining operations throughout Tanzania, with primary coverage of the Lake Victoria Goldfields (Mwanza, Kahama, Geita, Shinyanga and Bukombe), alongside the Lupa Goldfields around Chunya and Mbeya, and delivery nationwide from Dar es Salaam.

MwanzaKahamaGeitaShinyangaBukombeNyangʼhwaleTaboraDodomaArushaMbeyaChunyaSongweDar es SalaamMorogoroMtwaraKigoma
Specification note. The values on this page are industry-standard ranges for the equipment category, published so buyers can scope requirements before enquiring. They are not a quotation and do not describe a specific stocked model. Contact us with your duty, site conditions and power supply for a specification and quotation against your actual requirement.

Request a quotation

Need a pneumatic rock drill (jackleg) specified for your site?

Tell us your duty, depth or throughput and available power supply. We will come back with a specification and price, and flag anything on site that needs to change to make it work.