Generator Rental in Mbeya: 300 to 2,500 kVA

We rent generators from 300 kVA to 2,500 kVA in Mbeya and the Southern Highlands, for gold mines and processing plants in Chunya and Songwe, agro-processing, and construction. Every hire is delivered, installed and commissioned, with an operator on site and servicing included.

Diesel generator beside a gold processing plant in highland country
Mbeya

What generators are hired for in Mbeya

Chunya and Songwe gold mining

Mills, crushers, pumps and leach plants on the Lupa goldfield are large motor loads, and many sites are beyond reliable grid supply.

Agro-processing

Coffee, tea, rice and grain processing in the Southern Highlands needs dependable power through the harvest season, when an outage costs the most.

Construction on the southern corridor

Road, building and infrastructure projects along the Mbeya corridor that need site power before or instead of a grid connection.

Getting it there

Delivery to sites in and around Mbeya

01

Roughly 830 km by road from Dar es Salaam along the TANZAM highway

02

Chunya mining areas are a further drive north of Mbeya on roads that can be difficult in the rains

03

Highland weather means access plans should allow for the rainy season

We also supply mining equipment in Chunya: see mining equipment in Chunya.

Sizes

300 to 2,500 kVA

Generators are sized on the total running load and on the largest motor and how it starts. The calculator below gives a figure for your own loads.

Enclosed diesel generator of around 400 kVA on a concrete plinth beside a small wash plant
300 to 500 kVA
Containerised diesel generator of around 800 kVA beside a crushing and milling circuit
500 to 1,000 kVA
Two containerised generators running synchronised at a large processing plant
1,000 to 2,500 kVA
SizeTypically powersGood to know
300 to 500 kVAAlluvial wash plants, small ball mill circuits, construction sites, hotels, offices and hospitals on standbyCovers most small gravity and wash plants, with headroom for motor starting when the largest motor has a soft starter.
500 to 1,000 kVACrushing and milling circuits, larger processing plants, factories, large construction and road projectsSized on the largest motor and how it starts as much as on the total load.
1,000 to 2,500 kVAFull processing plants, mine site power, industrial facilities, temporary power during grid worksOften supplied as two or more sets running synchronised, so one can be serviced while the others carry the load.
Sizing calculator

What size generator do I need?

List what the generator will run. The calculator allows for motor starting surge and keeps the set below 80% load.

LoadkW eachQtyHow it starts
Running load
144 kVA
Largest starting surge
609 kVA
Generator needed
264 kVA
Rental size to ask for
300 kVA

Our smallest hire is 300 kVA, which covers this load.

Tip: the largest motor started direct on line is driving the size. A soft starter or VFD on it would let you hire a smaller set.

A first estimate only. Send us the load list and we will confirm the size before quoting.

Send this load list on WhatsApp
Included in every hire

Delivered, installed, run and serviced

Delivery and collection

The set is transported to your site and collected at the end of the hire, anywhere in Tanzania.

Installation and commissioning

Positioned, connected to your distribution board and tested under load before handover.

Operator on site

An operator stays with the generator for the whole hire, running it and checking it so faults are caught before they stop your work.

Servicing during the hire

Oil, filters and routine service on schedule, and breakdown response while the set is on hire.

Fuel
Supplied by you, the customer using the generator. We estimate the fuel use from your running hours so you can plan deliveries to site.
Minimum hire
One week for industrial, mining and construction work. Two days for events.
Getting a quote

How to rent a generator in Mbeya

  1. 01

    Tell us the load

    The size you need, or your load list: each motor’s kW and how it starts. The calculator above gives a first figure.

  2. 02

    Tell us the site and dates

    Where the generator goes, road access, the start date, how long you need it (minimum one week, or two days for events) and how many hours a day it runs.

  3. 03

    Get a quote

    We confirm the size and come back with a price for the whole hire, including delivery, installation, operator and servicing. Fuel is supplied by you.

FAQ

Generator rental in Mbeya: questions

Do you rent generators for mines in Chunya?

Yes. Mining hires have a one-week minimum and include delivery, installation, an operator on site and servicing. Send us the motor list and we will size the set.

What size generator does a gold processing plant in Mbeya Region need?

Mills and crushers started direct on line often push the requirement to 500 kVA or more; leach plants add agitators and pumps. Use the calculator on this page for a first figure, then send us the motor list.

Can you deliver a generator during the rainy season?

Yes, with planning. Tell us the site and the access road when you ask for a quote, so delivery can be timed and routed around wet roads.

Can a generator run a coffee or grain processing plant?

Yes. Size it on the plant’s motors and how they start, and tell us the hours it runs during the season.

More on sizes, prime and standby power and large loads: generator rental in Tanzania. Also in Mwanza, Dar es Salaam, Geita, Arusha, Dodoma, Morogoro, Tanga, Kahama and Mtwara.

Generator rental, Mbeya

Tell us the load and we'll size the generator

Send the size or your load list, the site and the dates, and we'll come back with a quote for the whole hire.