Generator Rental in Kahama: 300 to 2,500 kVA
We rent generators from 300 kVA to 2,500 kVA in Kahama, one of Tanzania’s main gold mining districts, for mines, processing plants, mining contractors and construction. Every hire is delivered, installed and commissioned, with an operator on site and servicing included.

What generators are hired for in Kahama
Gold mines and processing plants
Mills, crushers, CIL and CIP circuits and dewatering pumps across the Kahama goldfields, where outlying sites rely on generation.
Mining contractors
Contractors working for the larger mines need temporary power for camps, workshops and project sites, often for months.
Town and construction
Construction and commercial sites in a growing mining town, and standby power for businesses through grid outages.
Delivery to sites in and around Kahama
Roughly 1,000 km by road from Dar es Salaam
Close to Shinyanga and within reach of Geita and the Lake Zone
Outlying mine sites can be on unsealed roads; tell us the access when you ask for a quote
We also supply mining equipment in Kahama: see mining equipment in Kahama.
300 to 2,500 kVA
Generators are sized on the total running load and on the largest motor and how it starts. The calculator below gives a figure for your own loads.



| Size | Typically powers | Good to know |
|---|---|---|
| 300 to 500 kVA | Alluvial wash plants, small ball mill circuits, construction sites, hotels, offices and hospitals on standby | Covers most small gravity and wash plants, with headroom for motor starting when the largest motor has a soft starter. |
| 500 to 1,000 kVA | Crushing and milling circuits, larger processing plants, factories, large construction and road projects | Sized on the largest motor and how it starts as much as on the total load. |
| 1,000 to 2,500 kVA | Full processing plants, mine site power, industrial facilities, temporary power during grid works | Often supplied as two or more sets running synchronised, so one can be serviced while the others carry the load. |
What size generator do I need?
List what the generator will run. The calculator allows for motor starting surge and keeps the set below 80% load.
- Running load
- 144 kVA
- Largest starting surge
- 609 kVA
- Generator needed
- 264 kVA
- Rental size to ask for
- 300 kVA
Our smallest hire is 300 kVA, which covers this load.
Tip: the largest motor started direct on line is driving the size. A soft starter or VFD on it would let you hire a smaller set.
A first estimate only. Send us the load list and we will confirm the size before quoting.
Send this load list on WhatsAppDelivered, installed, run and serviced
Delivery and collection
The set is transported to your site and collected at the end of the hire, anywhere in Tanzania.
Installation and commissioning
Positioned, connected to your distribution board and tested under load before handover.
Operator on site
An operator stays with the generator for the whole hire, running it and checking it so faults are caught before they stop your work.
Servicing during the hire
Oil, filters and routine service on schedule, and breakdown response while the set is on hire.
- Fuel
- Supplied by you, the customer using the generator. We estimate the fuel use from your running hours so you can plan deliveries to site.
- Minimum hire
- One week for industrial, mining and construction work. Two days for events.
How to rent a generator in Kahama
- 01
Tell us the load
The size you need, or your load list: each motor’s kW and how it starts. The calculator above gives a first figure.
- 02
Tell us the site and dates
Where the generator goes, road access, the start date, how long you need it (minimum one week, or two days for events) and how many hours a day it runs.
- 03
Get a quote
We confirm the size and come back with a price for the whole hire, including delivery, installation, operator and servicing. Fuel is supplied by you.
Generator rental in Kahama: questions
Do you rent generators in Kahama?
Yes. We rent generators from 300 kVA to 2,500 kVA in Kahama and the surrounding mining areas, delivered and installed, with an operator on site and servicing included.
What size generator does a CIL or CIP plant in Kahama need?
A CIL or CIP plant runs a mill, agitators, pumps and an elution circuit, so it commonly needs 500 kVA to over 1,000 kVA. Send us the motor list and we will size it, often as two synchronised sets.
Can I rent a generator for a contractor camp?
Yes. Camps and workshops are mostly lighting, cooking, water pumps and tools. Use the calculator for a first figure, and tell us how long the camp will run.
How much fuel will the generator use?
Roughly 0.25 to 0.30 litres per kWh. A 500 kVA set at about three-quarters load burns 75 to 90 litres an hour. Fuel is supplied by you, so plan deliveries to site around this.
More on sizes, prime and standby power and large loads: generator rental in Tanzania. Also in Mwanza, Dar es Salaam, Geita, Arusha, Dodoma, Mbeya, Morogoro, Tanga and Mtwara.
Tell us the load and we'll size the generator
Send the size or your load list, the site and the dates, and we'll come back with a quote for the whole hire.